Renewable energy for the future.

FOLLOW US:

Our contacts

.

MASE – Incentivi FER per Autoproduzione

The MASE (Italian Ministry of the Environment and Energy Security) provides funding for businesses investing in self-generation of energy from renewable energy sources (RES). The aim is to reduce energy costs by generating and consuming renewable energy on-site.

Chi può accedere

✔ Imprese di qualsiasi dimensione
✔ Siti produttivi situati in Italia
✔ Aziende con consumi elettrici medio-alti

What Is Covered

✔ Photovoltaic systems
✔ Energy storage systems (when combined with a photovoltaic system)
✔ Upgrades to existing systems are also eligible (complete replacement is not covered)

❌ Non è ammessa la vendita totale dell’energia prodotta

Type of Incentive

💰 Non-repayable grant

Deadline

📌 Please note the application deadlines
A technical report certified by a qualified professional is required to proceed.
Deadline: 6 July 2026

⚠️ Le risorse sono limitate: l’ordine di presentazione è determinante.

Maximum Grant Rates

  • Photovoltaic: up to 63%
  • Energy storage:up to 48%

Additional increases in the grant rate may be available for modules listed in the Register (Categories A/B/C) and for companies certified to ISO 50001.

Perchè è interessante

✔ Riduzione immediata della bolletta
✔ Minore esposizione ai costi energetici futuri
✔ Miglioramento del profilo ambientale ed ESG
✔ Rientro dell’investimento accelerato

Ideal Customers

Businesses that:

  • Have industrial buildings or suitable surfaces for installation
  • Face high energy costs
  • Want to reduce operating expenses
  • Are considering energy efficiency solutions

Key Requirements

  • The project must concern una sola unità produttiva
  • Installation must take place on existing buildings or associated roof structures
  • System capacity: 10 kW – 1.000 kW
  • Energia destinata all’self-consumption; l’eccedenza non accumulata va fed into the grid and sold to the GSE
  • Localizzazione: unità produttiva in an industrial, production, or craft area in a Municipality with more than 5,000 inhabitants in one of the following regions: Basilicata, Calabria, Campania, Molise, Apulia, Sardinia, or Sicily
  • Work may begin only after the application has been submitted and must be completed within 18 months dall’ammissione

Contact us for more information

Lemon Sistemi S.p.A. offers a free preliminary assessment, technical and financial feasibility analysis, and assistance with incentive applications.

👉 Contact us now for a free quote and find out how much you could save by installing your new photovoltaic system.

Modulo MASE
Privacy Consent